
MTL 15
PRÜFCONTAINER | Mobile test lanes system
VP 700006
Description |
Description:
- Completely independent, functioning test container thanks to fully integrated power generator (optional)
- Hydraulic settling device incl. cable remote control, allows for easy change of location
- Fully operational in under 15 minutes
- Self-supporting 20 ft. steel container according to DIN ISO 668
- Office with PC workstation for staff
- Hydraulically operated, granule-coated entry and exit ramps
- Roof with weather protection can be lifted hydraulically
- Air-conditioning with heating function for office (optional)
- 360° rotation device for test container for easy positioning at location (optional)
- Can be expanded to a complete test lane with:
- MINC II EURO side slip tester
- MSD 3000 shock absorber tester
- MBT 7000 RS 3 brake tester with weighing system up to 18000 kg axle load (for operation with integrated power generator, drive power max. 2 x 9 kW)
- LMS 20/2 axle play tester
- MLT 1000 / MLT 3000 headlight tester
- MGT 5 / MDO 2-LON / MET-SERIES exhaust gas measuring instruments
- TWIN F IV 3.0 U MTL double scissor lift
- incl. installation of the test devices
Standard Delivery:
- Test containter MTL 15, installed and operational, including ordered test equipment
Documents |
Technical data |
Axle load | 15000 kg |
Track width | 880 mm - 2550 mm |
Fuse gG | 63 A |
Power supply | 3/N/PE 400 V 50 Hz |
Ambient temperature | -10 °C - 45 °C |
Air humidity | 100 % |
Dimensions container 20 ft. (H x W x L) | 2590 mm x 2437 mm x 6056 mm |
Weight | 12500 kg |
Fittings ISO 1161 bottom | JOST CC299 TL, CC 300 BR |
Fittings ISO 1161 top | JOST CC297 TL, CC 298 TR |
Drive-through width Test room max. | 3624 mm |
Drive-through height Test room (retracted roof) | 1995 mm |
Drive-through height Test room (extended roof) | 4287 mm |
Office space | 2 m² |
Gradient angle of ramps | 8 ° |
Images |
Films |
/cps/rde/xbcr/SID-2D8352C6-AB895963/maha_de/loading.gif
Request for quotation - MTL 15